Extend bearing stiffeners the full height of the girder.
تصميم girder bridge. Box girder bridges 277 a bridge box girder consists of see fig. A concrete deck or an orthotropic steel deck serving as the top flange. Plate girder bridges xg st floor plan cross section 4 1750 7000 xg st at intermediate cross girders at bridge ends 15000 brg stiff. The cmaa standard for cranes.
A stiffened plate as a bottom flange. Web plates vertical or inclined. Bridge elevation main girder pl 24x500 pl. تصميم الكباري الخرسانية المحمولة على كمرات rc bridge girder type تحميل ملف مثال محلول.
3 4 column or bracket support do not use framed or clip angle type connections. The bridge design process started in 1988 with the evaluation of seven different alternatives as part of the major struc tures report. Procedures for a three span prestressed concrete girder bridge. This was followed by the.
The bridge was designed by t. 9000 bearing roller hinged bearing 6x4500 27000 4 1750 7000 x g. The bridge consists of 43 75 ft 88 0 ft. Seshu adluri plate girders steel plate girders class 3 flanges class 4 webs reduce web area for m r stiffen the web to increase v r useful in pure bending as well as in beam columns.
A bridge crane is a type of overhead crane that includes two or more overhead runways built into the building s support structure. The figures on pages 5 and 6 show the elevation and typical. Spans with a 50 ft. Cmaa is the crane manufacturers association of america and cmaa 74 is the specification for top running and under running single girder electric traveling cranes utilizing.
Lin international of san francisco cal ifornia in conjunction with nakamura and tyau of honolulu hawaii. Site location is assumed to be near socorro new mexico with the bridge crossing a waterway on a normal perpendicular alignment. Bridge cranes have different configurations and can be comprised of one or two beams more often referred to as a single girder or double girder design. 6x4500 27000 field splice stringer heb 600 cross.
Becht engineering recently completed the structural analysis for a single girder 5 ton crane bridge with an under running hoist per cmaa 74 for nuclear waste handling operations. Crane girder design crane girder details proper detailing is the key to good fatigue performance the vast majority of crane girder performance issues occur at the crane girder to column connection. 36x600 main girder splice field brg stiff.